Bonds helicopter services September 2011 December 2011 Inverness Airport Eurovia Airport Services; Contract Manager Construction of new Helipad, Hanger and amenities including; PQ helipad Reinforced foundations and structures AGL Drainage Foul and surface water Ducting and services Interceptors Earthworks
M90 Concrete repairs Junctions 5 8; August 2011 September 2011 Eurovia Airport Services; Site Manager Major repair works to concrete bays Application of joint sealing Intensive traffic management including contra flow system
Dundee Airport; June 2011 August 2011 Lafarge contracting: Site manager/Engineer Major resurfacing/Strengthening works Main runway, Main apron and Taxiway reconstruction. Ducting, Drainage, Agl works, Delethalisation. Day to day management of all subcontractors, Material procurement, Liaising with client and design consultants, Line and level control including design elements and as-built surveys
April 2011 June 2011 Penycefn Water treatment works,Dawnus Construction LTD;Resident engineer Overlooking all aspects of external works including; Foul and surface water drainage, Hard/soft landscaping, Pressurised pipelines, Deep drainage, Kerbing, Ducting Surfacing operations.
February 2011 April 2011 RAF Northolt: Site Engineer/Agent; Colas LTD Innovative LED airfield signage installation, Application of Rhinophalt, Deep Drainage, AGL installation, Surfacing to taxiways, Major Block paving maintenance to ASP.
October 2010 February 2011 Deputy Contract Manager/Engineer: Colas LTD Falkland Islands M.P.A. Overlooking all aspects of the work including Engineering, P.Q., AGL installation, Ducting and drainage, Major resurfacing works, Joint sealing, Addigrip application, Grooving, lining, Various elements of design, Health safety and welfare.
Apr 2010 to October 2010 SITE MANAGER: Tarmac National Contracting Responsible for managing and coordinating £1.4m major reconstruction contract Appointed to provide multi utility diversions and to retain existing structures Implemented innovative clearview traffic control, lighting and drainage systems Liaised directly with Project Managers to ensure all requirements were met Managed the construction pedestrian and cycle refuge islands and crossings Coordinated full reconstruction of carriageways and footways, including kerbing
2007 to 2010 ENGINEER / SITE AGENT: Lafarge Contracting Responsible for managing various construction and engineering contracts Coordinated all project activities from initial conception to final delivery Provided leadership and mentoring to cross-functional teams of project staff Handled project planning, implementation, development and resources Managed change control, issue resolution and risk assessment activities |