Bonds helicopter services September 2011 – December 2011

Inverness Airport

Eurovia Airport Services; Contract Manager

Construction of new Helipad, Hanger and amenities including;

PQ helipad

Reinforced foundations and structures

AGL

Drainage – Foul and surface water

Ducting and services

Interceptors

Earthworks

 

M90 Concrete repairs Junctions 5 – 8; August 2011 – September 2011

Eurovia Airport Services; Site Manager

Major repair works to concrete bays

Application of joint sealing

Intensive traffic management including contra flow system

 

Dundee Airport; June 2011 – August 2011

Lafarge contracting: Site manager/Engineer

Major resurfacing/Strengthening works

Main runway, Main apron and Taxiway reconstruction.

Ducting, Drainage,

Agl works,

Delethalisation.

Day to day management of all subcontractors,

Material procurement,

Liaising with client and design consultants,

Line and level control including design elements and as-built surveys

 

April 2011 – June 2011

Penycefn Water treatment works,Dawnus Construction LTD;Resident engineer

Overlooking all aspects of external works including;

Foul and surface water drainage,

Hard/soft landscaping,

Pressurised pipelines,

Deep drainage,

Kerbing,

Ducting

Surfacing operations.

 

February 2011 – April 2011

RAF Northolt: Site Engineer/Agent; Colas LTD

Innovative LED airfield signage installation,

Application of Rhinophalt,

Deep Drainage,

AGL installation,

Surfacing to taxiways,

Major Block paving maintenance to ASP.

 

October 2010 – February 2011

Deputy Contract Manager/Engineer: Colas LTD

Falkland Islands M.P.A.

Overlooking all aspects of the work including

Engineering,

P.Q.,

AGL installation,

Ducting and drainage,

Major resurfacing works,

Joint sealing,

Addigrip application,

Grooving, lining,

Various elements of design,

Health safety and welfare.

 

Apr 2010 to October 2010

SITE MANAGER: Tarmac National Contracting

Responsible for managing and coordinating £1.4m major reconstruction contract

Appointed to provide multi utility diversions and to retain existing structures

Implemented innovative “clearview” traffic control, lighting and drainage systems

Liaised directly with Project Managers to ensure all requirements were met

Managed the construction pedestrian and cycle refuge islands and crossings

Coordinated full reconstruction of carriageways and footways, including kerbing

 

2007 to 2010

ENGINEER / SITE AGENT: Lafarge Contracting

Responsible for managing various construction and engineering contracts

Coordinated all project activities from initial conception to final delivery

Provided leadership and mentoring to cross-functional teams of project staff

Handled project planning, implementation, development and resources

Managed change control, issue resolution and risk assessment activities

Project List